ME 220

Miles 55
Endpoints US 1 in Waldonboro, ME 100 in Detroit
Surface Paved

NER Rating

  • No reviews yet!


Rated by Riders

One review per rider. Learn more about Rider Reviews and Ratings

You must Log In to leave a review. Read about NER User Accounts before attempting to register.

Average Rider Rating
ME 220 4.00/5 (1 Review )

  • ME 220

    May 31, 2020

    • Rider Rating


    Lots of new pavement on this road.  Waldoboro to Washington were paved in 2021.  Washington to Liberty/ME 105 are schedule to be paved in 2022 and may be done.

     

    2020-05-31

    The road is in great shape.  A little bumpy in Detroit, but it is a small town.

    How were the road conditions at the time you RECENTLY rode?

    Very Good - minor imperfections